Categories
Abolish Services (6)
Asset Protection (4)
Audio Distribution (7)
Bricks/bricklaying (42)
Building permit (9)
cabinetery (2)
carpentry (43)
color selection (18)
concrete (5)
Contract (42)
Council (31)
decking/alfresco (25)
demolition (29)
DLNA (3)
drafting (7)
electrical (2)
enviromental issues (26)
Family (12)
Finance (14)
fittings and fixtures (5)
flooring (1)
foundation/stumps (21)
Foxtel (1)
furniture (2)
garden (4)
HD Video (5)
heating/cooling (9)
insulation (6)
interior design (12)
landscaping (2)
man cave (8)
Onley Construction (3)
painting (1)
Phone (3)
Planning (96)
plaster (1)
plumbing (11)
Power (8)
Premier (36)
pretty pictures (3)
Prime Projects Construction (48)
Romeo Homes (33)
roof (15)
root barrier (5)
Site Preparation (99)
solar (1)
Uncategorized (102)
Utilities (15)
Video Distribution (5)
water tank/recycling (4)
weather (26)
windows (29)
WP Cumulus Flash tag cloud by Roy Tanck requires Flash Player 9 or better.
Project Milestones
- Place Deposit with Premier Builders:
1172 days ago - Change of Plan:
1099 days ago - Preliminary Building Agreement 1:
1067 days ago - Client Info Pack:
1034 days ago - Preliminary Plans:
975 days ago - House Demolition Day:
959 days ago - Received Final Contracts:
884 days ago - Bank Approval:
864 days ago - Contracts Signed:
853 days ago - Received Dispensation from council:
844 days ago - Root Barriers:
837 days ago - Block Excavated:
831 days ago - Applied for Planning Permit:
823 days ago - Prime Project Construction engaged:
729 days ago - Received Planning Permit:
714 days ago - Signed Contract with Prime and 5% deposit paid:
682 days ago - Building Permit Granted:
660 days ago - Block Set out:
658 days ago - Power being connected:
655 days ago - Water Meter moved and connected:
655 days ago - Sewage and Water being dug out:
655 days ago - Footings and slab:
630 days ago - Blindings spoil cleared:
627 days ago - Brickie Starting:
620 days ago - Concrete for piers poured:
617 days ago - Flooring Starts:
613 days ago - Framing Starts:
603 days ago - Roofing Starts:
588 days ago - Gutters and Facias Complete:
554 days ago - Solar Hot Water Panel Installed:
539 days ago - Roof Wrapped with Aircel:
532 days ago - Roofing Complete:
528 days ago - Some Windows Installed:
522 days ago - Security Data Cable Rough In:
471 days ago - Bricking - Stage 2 complete:
469 days ago - Upstairs Heating / Cooling Roughed In:
469 days ago - Lockup Chippies Start:
466 days ago - Last Windows Arrive:
448 days ago - Planned Lockup Date:
441 days ago - Start Plastering:
431 days ago - End Plastering:
427 days ago - Predicted Moving Day (Hopeful):
328 days ago
- Place Deposit with Premier Builders:
Archives
Minecraft
IP : Server is Offline
Category Archives: garden
A bit more deck
David has been busy this weekend making a walkway deck between the big cialis vs viagra deck and the washing lines. It looks great and I even got to make a start on the garden. Tomorrow the concretors are coming … Continue reading
Posted in garden
Leave a comment
Surviving the storm
For those who may have been wondering, our build survived the big hail and rain storm that came through on Christmas day. We won’t have to do as much excavation as we planned in some areas though as the massive … Continue reading
Its slab-o’clock!!
Went past the block today to deliver the last hamper to one of our neighbours. This is what I saw! Wowsers!!! Got out the camera and with the permission of the concreters I went and sat in our tree protection … Continue reading