Categories
Abolish Services (6)
Asset Protection (4)
Audio Distribution (3)
Bricks/bricklaying (23)
Building permit (5)
carpentry (19)
color selection (14)
concrete (5)
Contract (42)
Council (29)
decking/alfresco (14)
demolition (29)
DLNA (2)
drafting (6)
electrical (1)
enviromental issues (25)
Family (11)
Finance (14)
fittings and fixtures (1)
flooring (1)
foundation/stumps (20)
Foxtel (1)
garden (3)
HD Video (2)
heating/cooling (3)
insulation (3)
interior design (10)
landscaping (2)
man cave (8)
Onley Construction (3)
Phone (3)
Planning (96)
plumbing (6)
Power (6)
Premier (36)
pretty pictures (2)
Prime Projects Construction (47)
Romeo Homes (33)
roof (8)
root barrier (4)
Site Preparation (97)
solar (1)
Uncategorized (93)
Utilities (12)
Video Distribution (3)
water tank/recycling (3)
weather (21)
windows (29)
WP Cumulus Flash tag cloud by Roy Tanck requires Flash Player 9 or better.
Project Milestones
- Place Deposit with Premier Builders:
1197 days ago - Change of Plan:
1124 days ago - Preliminary Building Agreement 1:
1092 days ago - Client Info Pack:
1059 days ago - Preliminary Plans:
1000 days ago - House Demolition Day:
984 days ago - Received Final Contracts:
909 days ago - Bank Approval:
889 days ago - Contracts Signed:
878 days ago - Received Dispensation from council:
869 days ago - Root Barriers:
862 days ago - Block Excavated:
856 days ago - Applied for Planning Permit:
848 days ago - Prime Project Construction engaged:
754 days ago - Received Planning Permit:
739 days ago - Signed Contract with Prime and 5% deposit paid:
707 days ago - Building Permit Granted:
685 days ago - Block Set out:
683 days ago - Power being connected:
680 days ago - Water Meter moved and connected:
680 days ago - Sewage and Water being dug out:
680 days ago - Footings and slab:
655 days ago - Blindings spoil cleared:
652 days ago - Brickie Starting:
645 days ago - Concrete for piers poured:
642 days ago - Flooring Starts:
638 days ago - Framing Starts:
628 days ago - Roofing Starts:
613 days ago - Gutters and Facias Complete:
579 days ago - Solar Hot Water Panel Installed:
564 days ago - Roof Wrapped with Aircel:
557 days ago - Roofing Complete:
553 days ago - Some Windows Installed:
547 days ago - Security Data Cable Rough In:
496 days ago - Bricking - Stage 2 complete:
494 days ago - Upstairs Heating / Cooling Roughed In:
494 days ago - Lockup Chippies Start:
491 days ago - Last Windows Arrive:
473 days ago - Planned Lockup Date:
466 days ago - Start Plastering:
456 days ago - End Plastering:
452 days ago - Predicted Moving Day (Hopeful):
353 days ago
- Place Deposit with Premier Builders:
Archives
Minecraft
IP : Server is Offline
Category Archives: Prime Projects Construction
Photo free zone
No photos today. The weather yesterday was soooo crazy, so much rain we just couldn’t believe it. On Friday the insulation was finished over the left side of the house and along the back and the verandah area. Thankfully its … Continue reading
Windows and deck plans
Popped past the house after school coz our little birdie told us our guttering had arrived. As we turned the corner there was the truck with our windows on it! So now we have a pile of guttering and … Continue reading
Scaffolding has arrived
Took a fair bit of the day but now we have scaffolding up for the roof to go on.It was not at all like the scaffolding I was thinking of, you know the type you see in attached to the … Continue reading
Chippies are done…for now
We have had great working weather here today so the chippies have been hard at it. Meanwhile we are experiencing internet issues so posts will be short and sweet. Rang our draftsman today and he says he will have sketches … Continue reading
The back verandah!
It was a strange old Melbourne day today, rain in the morning, hot in the afternoon and then a big storm tonight. Add to that a sick child, sick husband and not well me and its been a big day! … Continue reading
A bit more carpentry and some fanciful ideas
Well the windows didn’t arrive Wednesday! Actually nothing happened both Wednesday or Thursday but on Friday the chippies were back. So we now have valleys on the roof, the dividing wall between the rooms upstairs and the gable is … Continue reading
Windows, doors, rain, a draftsman and cabinetry
This was supposed to post last night, not sure what happened. Update from today is that Dave spent this afternoon moving all the excess bricks into a big pile for us to use later. Other than that nothing has changed. … Continue reading