Categories
Abolish Services (6)
Asset Protection (4)
Audio Distribution (5)
Bricks/bricklaying (38)
Building permit (7)
cabinetery (2)
carpentry (39)
color selection (17)
concrete (5)
Contract (42)
Council (30)
decking/alfresco (24)
demolition (29)
DLNA (3)
drafting (7)
electrical (1)
enviromental issues (26)
Family (12)
Finance (14)
fittings and fixtures (3)
flooring (1)
foundation/stumps (21)
Foxtel (1)
furniture (2)
garden (4)
HD Video (4)
heating/cooling (6)
insulation (3)
interior design (11)
landscaping (2)
man cave (8)
Onley Construction (3)
Phone (3)
Planning (96)
plumbing (11)
Power (8)
Premier (36)
pretty pictures (3)
Prime Projects Construction (48)
Romeo Homes (33)
roof (15)
root barrier (4)
Site Preparation (98)
solar (1)
Uncategorized (102)
Utilities (15)
Video Distribution (5)
water tank/recycling (4)
weather (26)
windows (29)
WP Cumulus Flash tag cloud by Roy Tanck requires Flash Player 9 or better.
Project Milestones
- Place Deposit with Premier Builders:
1173 days ago - Change of Plan:
1100 days ago - Preliminary Building Agreement 1:
1068 days ago - Client Info Pack:
1035 days ago - Preliminary Plans:
976 days ago - House Demolition Day:
961 days ago - Received Final Contracts:
885 days ago - Bank Approval:
865 days ago - Contracts Signed:
854 days ago - Received Dispensation from council:
845 days ago - Root Barriers:
838 days ago - Block Excavated:
832 days ago - Applied for Planning Permit:
824 days ago - Prime Project Construction engaged:
731 days ago - Received Planning Permit:
715 days ago - Signed Contract with Prime and 5% deposit paid:
683 days ago - Building Permit Granted:
661 days ago - Block Set out:
659 days ago - Power being connected:
656 days ago - Water Meter moved and connected:
656 days ago - Sewage and Water being dug out:
656 days ago - Footings and slab:
631 days ago - Blindings spoil cleared:
628 days ago - Brickie Starting:
621 days ago - Concrete for piers poured:
618 days ago - Flooring Starts:
614 days ago - Framing Starts:
604 days ago - Roofing Starts:
589 days ago - Gutters and Facias Complete:
555 days ago - Solar Hot Water Panel Installed:
540 days ago - Roof Wrapped with Aircel:
533 days ago - Roofing Complete:
529 days ago - Some Windows Installed:
523 days ago - Security Data Cable Rough In:
472 days ago - Bricking - Stage 2 complete:
470 days ago - Upstairs Heating / Cooling Roughed In:
470 days ago - Lockup Chippies Start:
467 days ago - Last Windows Arrive:
449 days ago - Planned Lockup Date:
442 days ago - Start Plastering:
432 days ago - End Plastering:
428 days ago - Predicted Moving Day (Hopeful):
329 days ago
- Place Deposit with Premier Builders:
Archives
Minecraft
IP : Server is Offline
Category Archives: Uncategorized
A little bit of turf goes a long way!
Our driveway and pathways are in. We also have a new crossover and footpaths thanks to the builders. We had a great concreter, Frank, who really looked after us and we are really pleased with the result. This was done … Continue reading
1000 days
today marks 1000 days since we decided to go with Premier Builders and place a deposit.. A lot has happened since then, plans, , move out, demolition, death of my father, permit, preliminary building agreement, root barrier,romeo homes, wait for … Continue reading
We are in
Quick viagra uk update, handover done and our home is ours. It’s gorgeous…and muddy!!
Blowing hot and cold
Ok so the flooring didn’t start today but the heating and cooling guys did turn up, as did the painters and tilers. At the end of the day we have two tile shower bases…awesome. bathroom shower base Lots of … Continue reading
Working bee weekend
Well the long weekend is over and we have done heaps. On Saturday we were joined by my brother Pete and his lovely partner Jess. They did a great job shifting timber and demolishing the cubby. Jess dragged it all … Continue reading
the lights are on but nobodys home!! (this ones for you Kaz)
So much has been happening…so exciting!!! Handover day is officially June 22nd!! Woot woot!! Firstly deck and privacy screen photos. I have been out ordering curtains and lights. After much faffing about with the carpet sample … Continue reading